The quick read
  • Minimums and setup fees pay for fixed work that costs about the same on fifty pieces as on five thousand, which is why small orders carry a higher cost per piece.
  • A promo price is product cost, decoration cost and one time charges, and each part moves differently as quantity rises. Read quotes as separate lines, never as one number.
  • Setup is often negotiable on repeat artwork, larger quantities and bundled orders. Factory minimums, third party tooling and agreed rush fees usually are not.
  • Always ask what the next price break costs: a larger order can have a lower total, and a smaller order can cost more per piece than you expected.
  • Show setup and run charges separately and clients accept them, because the logic is easy to explain.

Why minimums and setup fees exist

Picture a decoration shop with one press and one operator. Whatever the order size, the same sequence of steps has to happen. Someone receives the artwork and checks it. Someone builds a proof and waits for approval. A screen is burned, or a plate is etched, or a stitch file is digitized. The press is loaded, adjusted until the colors line up, and tested on a scrap piece. Then the blanks are unpacked, decorated, inspected, counted and boxed for shipping.

Almost none of that work depends on how many pieces end up in the box. Setting up a job for fifty tote bags takes the same effort as setting it up for five hundred. That fixed work is what a setup fee and a minimum order quantity exist to recover. If a supplier priced every order at one flat number per piece, small jobs would lose money and large jobs would quietly pay for them, and the supplier would either raise prices for everyone or stop taking small work. Minimums and setup fees are the honest alternative. They say: here is what it costs to prepare the job, and here is what it costs to run each piece once the job is prepared.

Seen this way, a minimum is not a punishment for small buyers. It is the point where the fixed work stops dominating the cost. A supplier who sets a minimum at one hundred pieces has usually worked out that below that number, the setup would be more than a third of the total job and the customer would be angry about the price anyway.

The client who is annoyed at the wrong thing

Two complaints show up again and again. One client wants thirty branded bottles and learns the minimum is one hundred. Another is annoyed by a setup fee that looks large next to a small order. Both are reacting to the same fact: the work needed to make the first piece is nearly the same as the work needed to make the hundredth. Neither client has seen the inside of a decoration shop, so the charge feels arbitrary.

Your job as the person selling the order is to translate. A sentence that works for most buyers is this: the setup is the cost of making the tool, and the per piece price is the cost of using it. Once the client sees the tool, the fee makes sense. A screen printed logo needs a stencil made for it. An embroidered logo needs a stitch file written for it. No one asks why a key cutter charges the same to cut the first key as to cut the tenth, because the idea of a one time preparation cost is familiar once it has a picture attached.

1Artwork checkFile review and fixes2ProofMockup and approval3ToolingScreens, plates, stitch file4Press setupRegistration and test piece5Run and packPer piece production1Artwork checkFile review and fixes2ProofMockup and approval3ToolingScreens, plates, stitch file4Press setupRegistration and test piece5Run and packPer piece production
Every decorated order passes through the same fixed steps, whether it covers fifty pieces or five thousand.

Why this guide exists alongside the methods guide

This article is about the price structure: the minimums, the setup charges, the price breaks and the other fees that sit on a quote. It does not explain how each decoration method works. For that, read the companion piece on imprint methods, which covers how screens, plates, thread and lasers produce a mark. The two fit together. The method decides what kind of setup you pay for, and this guide explains how to read, compare and question the charge.

Every dollar figure here is illustrative. Real prices vary by supplier, product, quantity and season, so treat the numbers as ways to practice the arithmetic, and confirm anything you intend to quote with the supplier. Nothing in this article is a published Inkgility price.

The anatomy of a promo price

A quote for decorated promotional products looks like one number, but it is built from separate parts. Until you can see those parts, you cannot compare two quotes fairly, and you cannot tell which lever to pull when a client says the price is too high.

The three core lines

The first line is the product cost, the price of the blank item. A tumbler, a tote, a notebook, a polo. It is quoted per piece and it falls as quantity rises, because the supplier buys the blanks in volume and passes some of that saving on.

The second line is the decoration cost, per piece. It covers ink, thread, machine time, handling and labor. It also falls with quantity, though usually less steeply than the blank, because a press has to physically touch every piece no matter how many there are. Per piece decoration cost tends to flatten out once a press is running steadily.

The third line is the setup fee, a flat charge that does not change with quantity. This is the one that looks large on a small order and nearly invisible on a big one. It pays for the screens, plates, stitch files or fixtures that the job needs before any piece is produced.

The lines that appear less often

Beyond the three core lines, a quote may carry several others. A proofing or art fee covers work to redraw or clean up a logo. A color change charge applies when the product comes in several colors that each need their own setup. A second imprint location adds both setup and run. A less than minimum charge covers an order that falls short of the stated quantity. Freight, handling, a rush fee and sometimes a packing charge for individual bagging complete the list. A later section walks through each of them.

A quote that folds all of this into a single per piece number is convenient for a client who wants simplicity, and risky for a distributor who needs to know where the money is. When a client asks for a lower price, you need to know which line can bend. If you cannot see the lines, you will end up offering a discount that comes out of your own margin.

Writing a quote as a ledger

The habit that pays off fastest is to write every quote as a short ledger. One row for the blank, one for decoration, one for setup, then every other charge listed below with its reason. Do this even when the supplier gives you a single bundled price, by asking them to break it out. A supplier who cannot or will not itemize is a supplier whose quotes you cannot compare.

The ledger also makes it easy to answer the question every client eventually asks: what happens to the price if I order more? With the lines separated, you can recompute the total at several quantities in a minute. The blank and decoration lines scale with quantity. The setup line does not. Our guide to reseller margin math shows how to take that ledger and add your own margin on top without double counting.

Other feesFreight, rush, packing, artSetup feeOne time, flat per jobDecorationPer piece, falls slowlyBlank productPer piece, falls with volume1Other feesFreight, rush, packing, art2Setup feeOne time, flat per job3DecorationPer piece, falls slowly4Blank productPer piece, falls with volume
A promo quote is a stack of separate lines, and only the top two grow with quantity.
Which lines move when quantity changes
Quote lineChargedChanges with quantity?Typical lever
Blank productPer pieceYes, falls at each price breakChoose a product with a lower break
Decoration runPer pieceYes, flattens after the first few breaksFewer colors, fewer locations
SetupOnce per jobNoReorder window, bundling, higher quantity
Art or proof feeOnce per jobNoSend clean vector artwork
FreightPer shipmentPartlyConsolidate, ship to one address

Where minimums come from

A minimum order quantity looks like a single rule, but it usually comes from one of four different sources. Knowing which one applies tells you whether there is any room to negotiate, and saves you from arguing with a rule that cannot move.

The factory minimum

Many promotional items are made in large runs at a factory, often overseas. A custom shaped keychain, a woven lanyard or a printed pen made to a client's specification is produced to order, and the factory sets a minimum because starting a mold or loading a loom for a small quantity does not pay. The distributor you are talking to may want to sell you fifty pieces. The factory will not make fifty. This minimum is the hardest to move, and the honest answer is usually to order more or choose a different product.

The blank minimum

A supplier who stocks blanks in cartons or cases may only break a carton at certain sizes. A tumbler that ships in cases of twenty-four is easiest to sell in multiples of twenty-four. This is a softer minimum, and a supplier with stock on the shelf will often sell a partial case at a small premium.

The decoration minimum

A decorator may refuse a run below a certain number because the press setup would eat the profit. This minimum is separate from the blank, and it often has a workaround: a different method with lower setup, or a flat less than minimum charge that makes the job worth running.

The policy minimum

Some minimums are simply a supplier's business rule, such as a minimum order value that keeps small tickets from consuming account management time. These are the most negotiable of the four, especially for a distributor with an account and a history of repeat orders.

StatedminimumFactoryBlank stockDecorationSupplier policyFactoryBlank stockDecorationSupplier policyStatedminimum
One stated minimum can come from any of four sources, and each source bends differently.

How to find out which one you are facing

Ask the question directly. A short message does it: "Is the minimum on this item set by the factory, by blank stock, by the decoration, or by your own policy?" A good supplier will answer in a sentence. A supplier who does not know probably has not looked closely at the item, and that itself tells you something about how the rest of the order will go.

If the answer is factory, plan around it. If the answer is blank stock or decoration, ask what the supplier can do: partial cartons, another method, a flat fee. If the answer is policy, ask what a first order, a bundle or a repeat order might earn. Different sources, different conversations.

How price breaks work

A price break is a quantity threshold at which the per piece price drops. Promotional products are quoted at breaks such as twenty five, fifty, one hundred, two hundred fifty, five hundred, one thousand and five thousand. The first break is the minimum. Each higher break lowers the price because the supplier's fixed costs spread across more pieces and its purchasing and production both get more efficient.

The drop is not a straight line. It is steepest at the start and flattens out later, because the fixed cost is mostly absorbed by the time you reach a few hundred pieces. Think of a curve that falls quickly, then gradually levels off. A client who goes from fifty to one hundred pieces may see a large drop per piece. The same client going from one thousand to fifteen hundred sees a small one.

Why suppliers build breaks this way

Breaks serve two purposes at once. They reward larger orders, which are cheaper to run per piece. They also push buyers toward the quantities where the supplier is most efficient, such as a full carton, a full pallet or a full press shift. Reading a break grid, you are partly reading the supplier's own cost structure. A big step between two breaks often marks a physical change, like moving from a partial carton to a full one, or from a short press run to a long one.

The next break question

The most valuable question on any quote is: what does the next break cost? Here is why. Suppose, for illustration, a client is quoted a tumbler job at one hundred pieces and the combined product and decoration cost comes to a certain figure each. At the next break up, the per piece price drops. The client's total goes up, because more pieces are being bought, but the extra pieces cost far less each than the first hundred did. The cost of the additional pieces, calculated as the change in total divided by the change in quantity, is the real price of going up a tier.

Sometimes that extra cost per piece is lower than what the client would have paid for a replacement order later. If the client will plausibly use the extra pieces, the larger order is cheaper in practice. If they will not, they have bought waste. Either way, the client should make that choice knowing the numbers, and you should be the one to show them.

Rounding and the threshold effect

Break points are where suppliers apply their own rounding. A request for two hundred forty pieces may be quoted at the one hundred break, while two hundred fifty drops the price on the entire order. Ten extra pieces can lower the total. When a requested quantity sits just below a break, always ask the supplier to quote the next break as well. It is one of the cheapest favors a supplier can do for you, and it regularly finds savings the client did not know to ask for.

Illustrative figures$14.550$12100$10.5250$9.5500$8.91000$8.52500Illustrative figures50$14.5100$12250$10.5500$9.51000$8.92500$8.5
Illustrative per piece cost falls steeply at the first breaks, then flattens as fixed costs are absorbed.

Reading a break grid: a worked comparison

Break grids look simple, and they hide a trap. The per piece price is easy to read, but the decision depends on the total and on the extra cost of each step up. A short exercise makes this concrete.

Worked example, illustrative numbers

Suppose a supplier quotes a decorated tumbler at these illustrative combined prices per piece: $12.00 at 100 pieces, $10.50 at 250, and $9.50 at 500. Setup is a flat $75 for the job.

At 100 pieces: 100 times $12.00 is $1,200, plus $75 setup, for $1,275. That is $12.75 per piece all in.

At 250 pieces: 250 times $10.50 is $2,625, plus $75, for $2,700. That is $10.80 per piece all in.

At 500 pieces: 500 times $9.50 is $4,750, plus $75, for $4,825. That is $9.65 per piece all in.

Now look at the cost of each step. Going from 100 to 250 adds 150 pieces and $1,425 to the total, so each extra piece costs about $9.50. Going from 250 to 500 adds 250 pieces and $2,125, so each extra piece costs $8.50. Compared with the $12.75 per piece the client would pay at 100, those extra pieces are cheap. They are only a bargain if the client will use them.

Turning the grid into a decision

The numbers above lead to a short rule for the conversation with a client. If the extra pieces will be used within a reasonable time, the next break is almost always the better buy. If they will sit in a closet, they are a cost. A new hire kit that will be needed all year suits a larger order. A one day event giveaway does not.

There is a middle path worth offering: buy the larger quantity and hold part of it. For a client who needs one hundred now and will plausibly need one hundred more within the year, ordering two hundred fifty at once can beat two separate orders of one hundred, because it pays setup once and lands on a lower break. The caveat is storage and the risk that the logo or the design changes. If the brand is about to refresh, buy only what you will use.

Illustrative figures100 pieces$1275250 pieces$2700500 pieces$4825Illustrative figures100 pieces$1275250 pieces$2700500 pieces$4825
Illustrative all in total at three quantities: the total rises, but the cost of each added piece keeps falling.
Illustrative cost of each step up, using the example above
StepPieces addedTotal addedCost per added piece
100 to 250150$1,425about $9.50
250 to 500250$2,125$8.50
100 straight to 500400$3,550about $8.88

Watch the unit price, then the total

Clients fixate on the per piece price. That is natural, since it is the number printed in bold on most quotes. It is also the wrong number to decide on, because a lower per piece price at a higher quantity always produces a higher total. The right comparison is between what the client needs and what the job costs in total, plus what happens to the leftovers. Teach clients to ask "what is the total, and what is the cost of the pieces beyond what I need" and you will have fewer arguments about price and more orders sized correctly.

Setup fees by method

Setup fees vary because the fixed work varies by how a logo is applied. The charge follows the tooling. Methods that need a physical tool made for each design carry a setup fee tied to that tool. Methods that go from file to machine carry a small one, or none.

What each setup pays for

Screen printing pays for a screen made per ink color and for registering those screens on the press. A two color logo is two screens. Pad printing pays for an engraved plate per color and often a fixture that holds the product steady. Embroidery pays for digitizing, the process of converting artwork into a stitch file that tells the machine where to place each stitch, and it is typically charged once per design. Laser engraving pays for artwork preparation and positioning the product in a fixture. Full color digital and UV printing pays for file checks and a proof. Custom manufactured goods pay for a mold, die or custom tool, and these are the largest setup costs in the category.

Setup by method, with illustrative magnitudes only
MethodWhat the setup pays forScales withIllustrative size
Screen printA screen per color, registrationNumber of colorsSmall to moderate per color
Pad printA plate per color, a fixtureNumber of colorsSmall to moderate per color
EmbroideryDigitizing the stitch fileDesign complexityModerate, once per design
LaserFile prep, positioningFixture needsLittle or none
Digital and UVFile check, proofAlmost nothingLittle or none
Custom toolingMold, die or toolItem complexityLarge, one time

Two patterns worth noticing

First, methods without physical tooling have the lowest setup, which is exactly why they dominate short runs. If a client has thirty pieces and a tooled method adds a setup fee larger than the product, a low setup method may be the only sensible choice, even if its per piece cost is higher.

Second, methods with per color tooling make color count a direct price lever. A logo that needs four screens costs far more to set up than the same logo simplified to two colors. The conversation with the client's designer is sometimes as simple as asking whether the third and fourth colors are essential. For details on how each method handles color, see the guide to imprint methods.

Tooled methodsScreen, pad, embroideryHigher one time setupLower cost per piece atvolumeBest from a few hundredupUntooled methodsLaser, digital, UVLittle or no setupSteadier cost per pieceBest for small runsvsTooled methodsScreen, pad, embroideryHigher one time setupLower cost per piece at volumeBest from a few hundred upUntooled methodsLaser, digital, UVLittle or no setupSteadier cost per pieceBest for small runsvs
Tooled methods front load cost into setup, while untooled methods spread it across every piece.

A setup fee in context: the same job on three methods

Setup only means something once it sits next to the run cost. A logo that is cheap to set up and expensive to run can lose to one that is expensive to set up and cheap to run, and the winner changes with quantity.

Worked example, illustrative numbers

A hypothetical one color logo on 150 plastic pens. Pad printing has an illustrative setup of $55 and a run of $0.30 per pen, so $55 plus $45, or $100 in all. Laser engraving on a metal version of the pen has an illustrative setup of $10 and a run of $0.85 per pen, so $10 plus $127.50, or $137.50. Digital printing has a setup of $20 and a run of $0.95 per pen, so $20 plus $142.50, or $162.50.

At 150 pieces, pad printing wins on decoration cost alone. Cut the order to 40 pens and the picture flips: pad printing is $55 plus $12, or $67, while laser is $10 plus $34, or $44. The setup that looked small at 150 dominates at 40. None of these numbers is a real price. They show the shape of the math, which is the same with real quotes.

Notice what the comparison leaves out: the pens themselves differ in cost, and the metal pen costs more than the plastic one. Always compare the whole ledger, not only the decoration lines.

What a quoted setup fee does not tell you

A setup fee in isolation says little about quality, speed or reorder terms. Two suppliers can quote the same fee, and one stores the tooling for two years while the other discards it after ninety days. One includes a digital proof and the other charges extra for it. When you compare setup fees, also compare what comes with them: the proof, the storage, the reorder policy, and the allowance for small artwork fixes. A fee that looks high but includes all four can be cheaper over a year than a fee that looks low and includes none.

ToolingmadeProofincludedStoragetermsA fairsetup1231Tooling madeScreens, plates, files2Proof includedMockup and approval3Storage termsHow long it is keptA fair setup
A setup fee is only the overlap of three things: the tooling, the proof and the storage you get for the price.

Custom tooling and made to order goods

Most setup charges are small, because screens and plates are cheap compared with the products they decorate. Custom tooling is the exception, and it deserves its own discussion because it changes the economics of an order completely.

A custom shaped keychain, a molded stress toy in the shape of a client's mascot, a custom woven lanyard, a debossed leather item that needs a metal die: each of these needs a physical tool made before the first piece exists. A mold, a die, a loom pattern or a cutting template has to be built, tested and approved. That cost can run from a few hundred dollars to well over a thousand, and it is a one time charge for the life of the tool. The tool usually stays with the supplier or the factory, and the client pays for the right to use it, not for ownership, unless the agreement says otherwise.

Why the minimum and the tooling arrive together

Custom goods almost always combine a tooling fee with a high minimum. The factory builds the tool because it expects to run a meaningful quantity through it. If the order is too small, the tool cost per piece becomes absurd, and the factory declines. A shaped item that costs a few hundred dollars in tooling is reasonable at a thousand pieces and ridiculous at fifty. When a client asks for a custom shape in a small quantity, the best answer is usually to show what the tooling does to the per piece cost and offer a stock alternative.

Stock and imprint as the low minimum alternative

Nearly every custom item has a stock cousin. A custom shaped keychain has a stock shape with the logo printed or engraved on it. A custom woven lanyard has a stock lanyard in standard colors with a printed imprint. These cost less, run in smaller quantities and ship faster. They also look slightly less bespoke, which is the real tradeoff. For a campaign where the shape is part of the idea, the custom tool is worth it. For a general giveaway, the stock version is usually enough.

Who owns the tool

Ask this before you pay. A mold or die that the client paid for may belong to the client in principle, but physically sit at an overseas factory, and the practical cost of moving it is high. A reasonable agreement states how long the supplier will keep the tool, whether reorders at the same price are guaranteed, and what happens if the supplier changes factories. Ask for it in writing. Tooling cost is one time only if the tool is still there when you reorder.

Stock item,standardimprintNo tooling,lowest minimumStock item,specialfinishSmall plate ordieCustom coloror fabricLarger lot,higher minimumCustom shapeor moldTooling plusfactory minimumStock item, standardimprintNo tooling, lowest minimumStock item, specialfinishSmall plate or dieCustom color or fabricLarger lot, higher minimumCustom shape or moldTooling plus factory minimum
The more custom the item, the larger the fixed cost and the higher the minimum that makes it worthwhile.

The other fees on a quote

A quote that lists only the product, decoration and setup lines is not necessarily complete. Several other charges appear on real quotes, and some of them are easy to miss until the invoice arrives. Knowing the full list lets you ask for them up front and keep surprises away from your client.

The usual suspects

Proof or art fee. A charge for redrawing a low resolution logo into a clean vector file, or for building a mockup. It is often avoidable by supplying clean artwork. Our guide to color systems for designers explains how files should be prepared, and a clean file is the cheapest way to lose this fee.

Color change charge. If a product comes in several colors and each needs its own setup, the supplier may charge per color of blank. A tote in five colors can be five small setups.

Second location charge. A sleeve, a back print or the second side of a pen is another imprint. It generally carries its own setup and its own run cost.

Less than minimum charge. A flat fee applied when the order falls short of the stated quantity. It exists to make the small job worth running.

Packing charge. Individual poly bagging, hang tags, kitting or special packaging take labor, and suppliers charge for it per piece or per job.

Freight and handling. Shipping from the supplier to the client, or to several addresses. Splitting one order across many destinations multiplies the cost.

Rush fee. A surcharge for moving a job ahead in the queue or using faster production. Our guide to rush promo orders explains why this fee is firm and what it buys.

Sample or pre-production fee. A charge for a physical sample before the full run, sometimes credited against the order.

Pulling the list together

A good habit is to send the supplier a short request that asks for each of these by name. "Please confirm whether the quote includes proofing, packing, color change charges and freight, and itemize anything that does." It takes thirty seconds and removes the most common reasons a final invoice differs from the quote.

1Art or proofCleanup and mockups2Color changePer blank color3Extra locationSetup plus run4Under minimumFlat small order fee5PackingBagging and kitting6FreightPer shipment or address1Art or proofCleanup and mockups2Color changePer blank color3Extra locationSetup plus run4Under minimumFlat small order fee5PackingBagging and kitting6FreightPer shipment or address
Six charges that commonly appear after the three core lines of a promo quote.
A pre-order fee check to send with every quote request
Question to askWhy it matters
Is a proof or art fee included?Avoids a surprise charge after approval
Is any color change or location charge applied?Multiplies setup on multi color jobs
Does the price include packing and bagging?Kitting adds labor
What are freight and handling to my address?Destination changes cost
Is there a rush or sample fee?Easy to miss on tight calendars

How a bundled price can mislead

Some suppliers quote an all in price per piece that includes setup spread across the quantity. That can be genuinely helpful for a simple job. It can also hide that the same all in price would change at a different quantity, because the setup is a fixed number divided by a changing quantity. If you accept an all in number, ask for the setup portion separately so you can recalculate if the client changes the order.

What is negotiable

Suppliers will not discount everything, but several charges have real flexibility, particularly for distributors with an account and a regular volume of business. The key is to know which ones, and to ask with specifics.

Setup on repeat orders

Once a screen, plate or stitch file exists, there is no reason to make a new one. Most suppliers store these for a period, often twelve months or longer, and waive or sharply reduce setup on a reorder with identical artwork. Ask what the reorder policy is, and note the expiration. A reorder placed the week after the window closes can cost the full setup again for no reason except a missed date.

Setup at higher quantities

Many suppliers waive setup once an order passes a certain quantity or dollar threshold, because the fixed cost is trivial against a large invoice. If a client is near a threshold, nudging the quantity up can remove the fee, and the total can end up lower even with more pieces. This is worth asking about whenever the order sits close to a round number.

Bundled orders

A client who orders a pen, a tote and a notebook with the same logo is buying three jobs, but the artwork work overlaps. Some suppliers will reduce art or proof charges when the same logo goes on several products. Mention the bundle at the quote stage, not after the first item is approved.

Less than minimum fees

If a client wants forty pieces of an item with a fifty piece minimum, a supplier will often accept the order for a flat fee instead of requiring the full fifty. That fee is frequently less than the cost of ten extra pieces, and it spares the client from buying product they do not need.

Promotions and relationship terms

Suppliers run periodic offers that waive setup, discount a category or offer free shipping above a threshold. Distributors with accounts hear about these first, and can sometimes request similar terms on a specific order. A trade program with published tiers, which the Trade Print program is built to be, makes some of these terms predictable instead of dependent on a conversation.

Large but firmLarge and negotiableSmall and firmSmall and negotiableToolingSetup on reorderUnder minimumfeeRush feeArt feeFlexibility of the charge →Typical size of the charge →Large but firmLarge andnegotiableSmall and firmSmall andnegotiableToolingSetup onreorderUnder minimumfeeRush feeArt feeFlexibility of the charge →Typical size of the charge →
Charges plotted by how flexible they are and how much money is usually at stake.

Ask with specifics

"Can you do anything on the setup?" invites a shrug. "This is a reorder of the March order with the same logo, can the setup be waived under your reorder policy?" invites a yes or a clear reason for no. The more concrete the request, the easier it is for a supplier to say yes, because they can check a record and answer. A vague request forces them to guess what you want and defend their price.

What is not negotiable

Some charges are not worth pushing on, and knowing which ones saves goodwill with a supplier you will want to call again next month. Pushing on a charge that cannot move gets you nothing and costs you a little standing. Pushing on one that can move gets you real savings. The skill is telling them apart.

Costs the supplier pays to someone else

Third party costs are firm. If a supplier has to pay a factory for a mold or an overseas production minimum, they cannot reduce what they pay, and they will not absorb it. The same applies to embroidery digitizing sent to an outside digitizer, which the supplier has already paid for by the time you see the invoice. Appeals on those charges rarely work, and the supplier is not hiding anything. They are passing a cost through.

Hard factory minimums

A custom woven lanyard that the factory will not make below five hundred pieces cannot be sold in a run of one hundred, no matter how much a distributor would like to. The choice is to order more or pick a different product. Asking the supplier to break a factory minimum is like asking a bakery to sell you a third of a cake that was baked as a whole.

Rush charges once agreed

A rush fee pays for a real disruption to a production queue. Someone's job moves back so yours can move forward, and overtime may be involved. Once you agree to a rush, the fee is firm. Before you agree, it is fair to ask whether a partial rush, splitting the order or accepting a slightly later date would lower it.

The per piece product price at a given break

A request for a lower price at a smaller quantity is a request to ignore the supplier's costs, and it will be declined. The break grid is a map of those costs. You can ask for a higher break by buying more. You cannot ask for the higher break's price while buying less.

The practical line

The line between negotiable and firm is simple. Fixed costs that the supplier has already absorbed, such as an existing screen or stitch file, can move. Costs the supplier pays to someone else, or the physical limits of a factory, cannot. When you are unsure which side a charge falls on, ask. "Is that a cost you pay outside, or something we can look at?" is a polite question that most suppliers answer honestly.

Does the supplier pay this cost tosomeone else?Yes, third party or factoryTreat as firm and plan arounditNo, it is their own fixedcostAsk, with specifics, for areductionDoes the supplier pay this costto someone else?Yes, third party or factoryTreat as firm and plan around itNo, it is their own fixed costAsk, with specifics, for areduction
A quick test for whether a charge is worth pushing on.

How to ask: a short playbook

The way you ask changes the answer. Suppliers hear requests for discounts all day, and the ones who get yes are the ones who make it easy. A few habits work almost every time.

Know your position first

Before you contact a supplier, decide what you can offer. A larger quantity, a firm commitment to reorder, bundling several products, accepting a longer lead time or using their standard product instead of a custom one are all things a supplier values. A request that offers something is a negotiation. A request that offers nothing is a complaint.

Lead with the specific ask

Describe the order, the charge and the reason in one or two sentences. For example: "I have a reorder of the same embroidered polo from the spring order, same logo and thread colors. Under your reorder policy, can the digitizing fee be waived?" Everything the supplier needs is in the message, including the evidence that a record exists.

Offer a trade where you can

If the charge cannot move, ask what could. A supplier who cannot lower the setup fee may be able to waive the proof fee, ship free above a certain total or offer a break at the next quantity. "If the setup stays, is there anything on shipping or the art charge?" turns a no into a partial yes.

Be honest about alternatives, without bluffing

A competing quote is useful information, and a bluff is not. If you have another quote, say so plainly and ask whether the supplier can match a specific line. Suppliers know the market, and a clumsy bluff costs credibility you will want later.

Keep a record

Write down every answer: who said it, when, and for what order. Reorder windows, waived fees and promotional terms have a way of being forgotten, especially across a team. A shared note per supplier saves the same conversation from happening three times.

Message templates for the three most common requests
SituationA message that gets a clear answer
Reorder"Reorder of order [number], same artwork and colors. Does your reorder policy waive the setup?"
Just below a break"The client wants 240 pieces. What is the price at 250, and what is the setup at each?"
Just under the minimum"The client needs 40 and the minimum is 50. Is there a flat less than minimum charge?"
BeforeDecide what you can offerAskName the order and the chargeTradeOffer volume or a bundleConfirmGet the answer in writingLogNote the terms for next timeBeforeDecide what you can offerAskName the order and the chargeTradeOffer volume or a bundleConfirmGet the answer in writingLogNote the terms for next time
A simple sequence for a fee conversation, from preparation to a written record.

Ordering below the minimum

A client with a small budget or a small team may ask for fewer pieces than the stated minimum. Before you say no, work through the options in this order. Each one has a cost and a tradeoff, and the best choice depends on which matters most to the client.

Option one: the less than minimum quote

Ask for a quote at the actual quantity with a flat less than minimum charge. Many suppliers keep a standard fee for this, and it is often reasonable. Check whether the blank itself can be bought at that quantity, since a decoration minimum is different from a blank minimum. The flat fee may be lower than the cost of buying the extra pieces to reach the minimum.

Option two: change the method

A screen printed tote with a one hundred piece minimum may have a much lower minimum when it is digitally printed or heat transferred. Laser engraving is another low minimum choice for metal and wood. The look differs and the per piece price is usually higher, but the total on a small run can be far lower. Do the arithmetic at the real quantity, not the per piece number alone.

Option three: change the product

Stock items with a simple imprint have lower minimums than custom made goods. A client who wanted a custom shaped item might be satisfied by a stock item in a similar style. A catalog item that the supplier already holds in stock can sometimes be decorated in small quantities because there is no factory run involved.

Option four: combine with another order

If you have another client or another job going to the same supplier with the same blank, ask whether the quantities can be combined. Some blanks share a minimum across colors, and some decoration setups can be shared across jobs with the same artwork.

Option five: order the minimum and use the surplus

Sometimes the honest answer is to buy the minimum. The cost of ten extra pieces might be small compared with any workaround, and the extras become spares, replacements for lost items or reserve for the next hire. This only works when the item is not perishable and the logo will not change soon.

Ask for a flat under minimum quoteCompare a low setup methodSwitch to a stock itemCombine with another orderOrder the minimum and keep sparesAsk for a flat under minimumquoteCompare a low setup methodSwitch to a stock itemCombine with another orderOrder the minimum and keepspares
Five routes to try before telling a client the minimum cannot be met.

When to say no

Not every request has an answer. If the client wants twenty pieces of a custom tooled item, the honest answer is that it cannot be done at a sensible price, and the best help you can give is a clear explanation and an alternative. A distributor who explains why is remembered better than one who quotes an absurd number to avoid saying no. The client may return next quarter with a larger budget, and they will remember who was straight with them.

A short story to keep in mind

Consider a distributor who asks a supplier to waive a digitizing fee on a brand new logo and is told no, then asks the supplier to include the first proof without charge and is told yes. The distributor has learned two things in two minutes: the digitizing is a cost already paid outside, and the proof is the supplier's own time. This is how experienced buyers work. They probe the edges of a price structure with questions and let the answers show where the flexibility sits, instead of arguing the whole quote at once.

Keep a private list for each supplier of the charges that moved and the ones that did not. After a handful of orders, you will know without asking where each supplier is flexible, and the conversations get shorter for both sides.

How colors, locations and blank variations multiply the fees

A setup fee quoted for "a logo" is rarely the setup fee you end up paying, because a logo is not one thing. It is a number of colors, placed in a number of locations, on a number of blank variations. Each of those multiplies the fixed work. Understanding the multiplication is the quickest way to bring a quote down without touching the supplier's margin at all.

Colors

On tooled methods, every ink color needs its own screen or plate. A one color logo needs one tool. A four color logo needs four, and the press needs four passes, each of which takes registration time. That means the setup fee scales roughly with the number of colors, and so does the run cost, because each additional color is another pass over the piece. A designer who can reduce a four color logo to two colors, or who can offer a one color version for small items, is quietly cutting both lines.

Dark products add one more factor. On a black or navy shirt, a printer often lays down a white base layer so the colors on top stay bright. That base is another screen and another pass, so a two color logo can be quoted as three colors on a dark garment. Ask how the quote counts the underbase before you compare two prices.

Locations

Every additional imprint location is another setup and another run. A pen with a logo on the barrel and a web address on the clip is two locations. A shirt with a chest logo and a back print is two, each with its own screen set. Some products are decorated on equipment that can do multiple positions in one pass, and then the second location may be cheaper, but do not assume it. Ask for each location itemized, so the client can decide whether a back print is worth its cost.

Blank variations

A tote offered in five colors might need five separate setups if the ink color has to change with the bag. Many suppliers charge a color change fee for this. If the client is flexible, standardizing on one or two blank colors lowers the setup bill. Sizes can matter too. A garment decorated in a wide range of sizes may need more than one screen size or more than one stitch file if the logo has to be scaled. Ask whether the supplier treats sizes as one job or several.

How each variable multiplies fixed work, with illustrative effects
VariableWhat changesEffect on setupEffect on run
More ink colorsExtra screens or platesRises with each colorExtra pass per color
Dark blankUnderbase layerOften counted as a colorExtra pass
Extra locationA second imprintA second setupA second run
More blank colorsChangeovers between colorsPossible color change feePress cleaning time
One logo, one color, one placeThe smallest setupAdd a second colorA second screenAdd a dark blankAn underbase passAdd a secondlocationA full second setupOne logo, one color, oneplaceThe smallest setupAdd a second colorA second screenAdd a dark blankAn underbase passAdd a secondlocationA full second setup
Each layer of complexity adds setup before the first usable piece exists.

A habit that helps

Before you send artwork, ask the designer three questions: how many colors are essential, which locations are essential, and how many blank colors the program really needs. A short conversation at the design stage costs nothing. The same questions at the invoice stage cost money.

Reorders, stored tooling and the reorder window

If you take one idea from this guide for repeat clients, take this one. The setup you pay for on the first order can be reused on later orders, but only if the supplier keeps the tooling and only for as long as they keep it. Managing that window is one of the highest value habits in promotional products.

What gets stored

Screens are reclaimed after a run to be used again, but a shop may photograph or tag a screen set and keep it for a period. Pad printing plates are metal or polymer and keep well. Embroidery stitch files are digital and cost nothing to store. Laser and digital files are digital too. Custom tooling for molded or die cut goods sits at the supplier or the factory. Storage is cheap for digital assets and awkward for physical ones, which is why reorder policies for screens often have a shorter life than policies for stitch files.

The window

Many suppliers hold tooling for a set time after the last run, often a year or longer, and some hold it indefinitely for active accounts. Ask each supplier what their policy is and write it down. The date to watch is not the date of the original order, but the date of the last order that used that artwork. Each reorder can restart the clock, which rewards clients who order regularly.

What breaks a reorder

A reorder is only a reorder if nothing changed. A new logo, a different brand color target, a modified placement, a new substrate, a different size range or even a different blank color can all turn a reorder into a new job. Suppliers differ in how strict they are. Some treat a minor edit as a revision with a small fee. Others treat it as a fresh setup. Ask the question when you brief the work: "If the logo is updated slightly next year, does the stored tooling still apply?"

Keep your own records

A distributor who keeps an artwork archive saves every client from a repeat of the original design work. Save the approved proof, the vector artwork, the thread or ink color callouts, the supplier's job number and the date of the last run. A simple folder per client does the job. When a reorder request arrives six months later, you can quote it in minutes, and you can show the supplier exactly what you want reused.

Stitch filePad plateScreen setCustom diemonthsStitch filePad plateScreen setCustom diemonths
Illustrative tooling storage windows: a reorder inside the window skips setup, a reorder after it pays again.

A worked comparison: two quotes for the same job

Quotes from two suppliers rarely look alike, which makes them hard to compare. A short worked example shows how the ledger approach turns a confusing pair of quotes into a clear decision.

Worked example, illustrative numbers

A client wants 250 embroidered caps with a single logo. Two suppliers respond. Every figure below is made up to show the method.

Supplier A quotes $11.40 each all in. A note says setup is included and shipping is extra.

Supplier B quotes $9.80 each for the cap and decoration, a $65 digitizing fee, a $30 proof fee, and $85 shipping.

Rebuild both on the same ledger. Supplier A: 250 times $11.40 is $2,850. Setup is included, shipping is extra. Ask for the shipping figure. If it comes to $85, the all in total is $2,935.

Supplier B: 250 times $9.80 is $2,450. Add $65 and $30 and $85, for $2,630.

The gap is $305, or about $1.22 a cap. But the two quotes are only comparable if the logo, thread colors, cap style and delivery date match. If Supplier A includes a free reorder window on the stitch file and Supplier B does not, that is worth something on a repeat order. If B has a four week lead time and A has two, that matters too.

The questions the comparison raises

Having rebuilt the ledger, you can ask sharper questions. Is the cap the same style and quality? Does the quoted price include the same number of thread colors? What is the lead time? What happens on a reorder? A quote is not a number. It is a set of terms, and the lowest total only wins if the terms are equal.

What to show the client

Clients rarely need the full ledger, but they should see a clean summary. Show the total at the requested quantity, the total at the next break, the one time setup and any extra charges, in a short table. A client who sees the setup on its own line, with a one sentence explanation, accepts it far more readily than one who sees a single unexplained total.

Supplier ASupplier BTotal price atquantityItemized clearlyReorder windowstatedLead timeProof includedIllustrative scoring, 0 is weakest and 3 is strongest.Total price at quantitySupplier ASupplier BItemized clearlySupplier ASupplier BReorder window statedSupplier ASupplier BLead timeSupplier ASupplier BProof includedSupplier ASupplier BIllustrative scoring, 0 is weakest and 3 isstrongest.
A comparison grid for two supplier quotes: score what each one includes, not only the total.

Building a quote ledger and adding your margin

Once you can read a supplier quote as separate lines, the next step is to turn it into a client quote without losing money. The ledger is a plain table, and the discipline is to fill it the same way every time. It is not complicated, and it is where most small distributors quietly leak profit.

The supplier side of the ledger

Start with what you will pay. List the blank, the decoration, the setup, every other fee and the freight to your door or your client's door. Then work out the supplier total at the exact quantity, and at the next break above and below it. Three columns instead of one, because you will want to answer "what if we order more" and "what if we order fewer" without going back to the supplier.

Be strict about the quantity. A quote for two hundred fifty pieces has no bearing on an order for two hundred forty. Be strict about the terms too: if the supplier's quote assumes a two color logo on a light product and the client's logo has an underbase on a dark one, the ledger needs a note and the number may be wrong.

The client side of the ledger

Now decide how you will present the price. There are two honest approaches. In the first, you show a single all in price per piece, which includes your margin and spreads the setup across the quantity. In the second, you show product and decoration at a per piece price and the setup as a separate line. The first looks simpler to a client. The second makes it easy to defend the setup fee and to show savings at a higher quantity.

For most clients who are buying promotional products for the first time, the second approach builds more trust, because they see what the one time cost is. Larger or more price sensitive buyers sometimes prefer the first because it makes comparison easier.

Margin on each line

Apply your margin to the whole job, not only to the product. A common mistake is to mark up the blank and pass setup and freight through at cost, which leaves money on the table for the work you do coordinating the setup and the shipping. The opposite mistake is to mark up everything so heavily that the setup line looks inflated next to a competitor's. Our guides to reseller margin math and to passing finish costs through to clients go deeper on markup and itemizing.

A ledger layout that works

A ledger layout, with the three quantity columns
LineAt 100At 250At 500
Blank product, per pieceenterenterenter
Decoration, per pieceenterenterenter
Setup, one timeenterenterenter
Other fees, one timeenterenterenter
Freightenterenterenter
Supplier totalsumsumsum
Your marginpercentpercentpercent
Client totalsumsumsum
Client price per piecedividedividedivide
Get supplierlinesTotal at threequantitiesAdd yourmarginShow theclientAdjust andrebuildQuote ledgerQuote ledgerGet supplier linesTotal at three quantitiesAdd your marginShow the clientAdjust and rebuild
A quote is a loop: rebuild the ledger whenever the quantity, method or terms change.

Keep the margin on the setup

One more thing worth saying plainly. A setup fee is not a pass through unless you decide it is. You are doing real work around it: collecting artwork, approving proofs, answering questions and fixing mistakes. If your pricing treats the setup as free money for the supplier and a cost to you, you are not getting paid for the labor attached to it. Build your margin into the line, and be willing to explain it, the same way the supplier does.

Explaining minimums and fees to clients

Everything above is wasted if it cannot be said in plain language to the person paying. Clients do not care about screens and stitch files. They care about what they get, when it arrives and whether the price is fair. Your job is to give them a short, honest account that makes the fees feel logical.

The one line explanation

Have a one sentence answer ready for each charge. For the minimum: "The shop does the same preparation work whether it makes fifty or five hundred, so below a certain number the price per piece stops making sense." For setup: "Setup is the one time cost of making the tool for your logo. After that, each piece is much cheaper." For price breaks: "Ordering more spreads the setup further, so the price per piece drops."

Say these in your own words, but keep them short. A client who hears three sentences about screen burning and emulsion has stopped listening. A client who hears one clear sentence and then sees the number usually nods.

Show the options, not just the answer

When a client pushes back on a price, do not argue. Offer a choice. Show the quote at the requested quantity and the next break. Show a lower setup method with a different look. Show a stock item with an imprint in place of a custom one. Three options at three prices put the decision in the client's hands, which feels better than being told no, and often ends in an order a little larger than first planned.

Handling the most common objections

Common client objections and honest replies
ObjectionA reply that helps
"The setup fee is too high for such a small order.""It is the same work as a big order. We can lower it by simplifying colors, using a low setup method or ordering a bit more."
"Why is the minimum so high?""Part of it is the factory and part is the setup. Here is a stock alternative with a lower minimum."
"Can you waive the fee this time?""If it is a reorder inside the window, yes. For a new design the tool still has to be made. Let me see what else I can adjust."
"Your competitor shows a lower price.""Let me compare line by line. Their quote may leave out setup, shipping or proofing."

Be honest when the answer is no

A client who wants fifty custom molded pieces for a small budget is not helped by an inflated quote that makes the project look possible. Say what the cost structure forces, and offer the nearest thing that works. People remember a straight answer, and they come back when the budget is bigger.

Defensive replyThat is just our policyThe fee is notnegotiableTake it or leave itExplained replyHere is what the feepays forHere is what we canadjustHere are three optionsat three pricesvsDefensive replyThat is just our policyThe fee is not negotiableTake it or leave itExplained replyHere is what the fee pays forHere is what we can adjustHere are three options at threepricesvs
Two ways to answer a pricing objection, and what the client hears in each.

Common mistakes and a pre-quote checklist

Most quote problems repeat. A few mistakes cause the majority of the arguments, and a short checklist before each quote catches them early. This section collects both.

The recurring mistakes

Quoting from a catalog price. The number on a product page is a starting point at a particular quantity with a standard imprint. Real jobs add decoration, setup and fees. A distributor who quotes straight from a catalog price will find the supplier's invoice higher than the client's price.

Ignoring the underbase. A two color logo on a dark garment is often a three color job. If this is not asked up front, the margin disappears on the first invoice.

Assuming a reorder is free. Setup is only waived if the supplier still holds the tooling and the artwork is unchanged. Confirm both before telling the client.

Quoting the wrong quantity. A client who says "about two hundred" may mean one hundred eighty or two hundred forty. Quote the break below and the break above, and pin the number down before you commit.

Forgetting freight and packing. These are the charges that surface at the end. Ask for them at the start.

Comparing unit prices instead of totals. The cheapest unit price at the highest quantity is not the cheapest order for a client who needs half as many.

Skipping the proof. A proof is a promise. Approving one without checking spelling, colors and placement transfers every error to the client, and to you.

The pre-quote checklist

Quantity confirmedAnd the next break notedColors countedIncluding any underbaseLocations listedEach one itemizedSetup shown separatelyOther fees asked aboutArt, packing, color changeFreight confirmed tothe addressReorder window notedLead time and rushterms statedQuantity confirmedAnd the next break notedColors countedIncluding any underbaseLocations listedEach one itemizedSetup shown separatelyOther fees asked aboutArt, packing, color changeFreight confirmed to theaddressReorder window notedLead time and rush terms stated
Eight checks that remove most of the surprises before a quote leaves your desk.

Why the checklist works

None of these items is difficult. The reason to use a list is that quotes get written quickly, between other tasks, usually when a client is waiting. Under that kind of pressure, people skip steps they know perfectly well. A checklist replaces memory with habit, and it is especially useful in a small team where several people write quotes in slightly different ways.

A good practice is to review a month of past quotes and note where the invoice differed from the quote. If a charge shows up more than once, add it to the checklist. Over a year, your list becomes a record of every way a job can surprise you, and the surprises get rarer.

Sample orders, test runs and first orders

A first order with a new client is a special case. Both sides are learning. The client does not yet know how the product will look, and you do not yet know how the supplier will perform. Minimums and setup fees feel heavier here, because there is no history to spread them across. A few approaches reduce the risk without overspending.

The pre-production sample

A physical sample on the real product is the cheapest insurance in the business. It shows color, contrast, hand and fit that a screen proof cannot. Suppliers charge for samples in different ways: a flat fee, a fee credited against the order, or a free sample for established accounts. The charge usually covers real setup, because a sample made with the real tooling means the tooling exists, and a good supplier will apply that tooling to the main order. Ask whether the sample fee is credited when the order goes ahead.

For a large or high stakes order, buy the sample. For a repeat of a design that has already run well, skip it. The test is simple: if a failed order would cost more than the sample, pay for the sample.

The pilot order

When a client is nervous about committing to a large quantity, propose a pilot: a small first order at a higher per piece price, followed by the larger order once the product has proved itself. The pilot pays the setup, and the main order reuses it if it follows inside the reorder window. The client buys certainty for a modest premium. This works well for new hire kits, where a team can try a small run before the whole program commits.

There is a catch worth naming. A pilot at a low quantity carries a high per piece price, so the client pays more for the first pieces than they would in a single large order. The pilot is worth it only if the uncertainty is real. If the client already knows exactly what they want, order the full quantity.

Splitting one design across several small orders

Some clients want to place several small orders over the year for the same design, such as quarterly hiring waves. Compare the total of one large order held in storage with several small orders that each pay a minimum or a setup fee. The large order is cheaper, but ties up cash and space and risks a logo change. The small orders cost more in fees but keep inventory lean. Often the best answer is a middle path: two orders a year, timed to the supplier's reorder window.

1SampleOne real piece2ApproveColor and placement3PilotSmall first order4Full orderInside the window1SampleOne real piece2ApproveColor and placement3PilotSmall first order4Full orderInside the window
A sensible path for a first order with an uncertain client: sample, pilot, then full run inside the reorder window.
Worked example, illustrative numbers

A client plans a hundred and twenty new hire kits over a year but is unsure the embroidered quarter zip will be popular. A single order of 120 at an illustrative $34 per piece with a $60 setup totals $4,140. Two orders of 60 might price at $38 each with the same setup, so $2,280 plus $60 is $2,340 for the first. If the second run falls inside the reorder window and setup is waived, it is another $2,280. The two orders total $4,620, which is $480 more than the single order. That $480 is what the client pays for the option to change the design or the quantity halfway. If the change is likely, the premium is cheap. If not, order once. All numbers are made up for the example.

Planning minimums and fees into a budget

A client with an annual budget needs to know what the fixed charges will total across a year, not only on one order. A distributor who can answer this question becomes a planning partner, not just an order taker, and that is where the better margins and the longer relationships are.

Counting the fixed charges across a year

List every design the client plans to order, with the number of times each is likely to run. For each design, note the setup, the expiry of the reorder window, the minimum and any other one time fee. Then mark which runs fall inside a window and which will not. The sum of unavoidable setup fees is the real fixed cost of the program.

A client who reorders three times a year inside a window pays setup once. A client who reorders once every fourteen months pays it every time. Moving one order two months earlier can save the whole fee.

Consolidating designs

A program that uses eight slightly different logos pays eight setups. A program that standardizes on two versions, for example a full color and a one color, pays two. Standardizing is less about design taste than about cost. Ask the client whether the variants are intentional. Often they are accidents of history, created when different teams ordered from different places.

Timing orders to the supplier calendar

Suppliers have busy seasons, and some run promotions in quiet ones. Orders placed in the weeks before major holidays and the peak conference season tend to meet longer lead times and fewer concessions. Orders placed in slower periods may earn more flexibility on setup. Our companion piece on promo product timelines shows how to work backward from a date.

Sharing the plan with the supplier

Many suppliers give better terms when they can see the year ahead. A distributor who says "I expect four orders of this design over the next twelve months" is offering something the supplier values: predictable volume. Ask whether a committed schedule earns a longer reorder window, a waived setup or a better price break, and put any agreement in writing.

Illustrative figuresFixedchargesSetup on new designs45%Setup missed reorderwindow25%Art and proofing15%Under minimum fees15%Illustrative figuresFixedchargesSetup on new designs45%Setup missed reorder window25%Art and proofing15%Under minimum fees15%
An illustrative split of one year of fixed charges for a client with several designs, showing where consolidation helps most.

An annual fixed charge worksheet

A small worksheet for one design, repeated for each design in the program
ItemWhat to record
Design nameLogo version and placement
MethodScreen, pad, embroidery, laser, digital
Setup amountThe one time charge
Window endsDate stored tooling expires
Planned runsDates and quantities
Runs inside windowWhich ones skip setup
Other one time feesArt, proof, color change

Minimums and fees for resellers using a trade program

Everything so far applies to any buyer. A reseller, a distributor, a designer or an agency who buys promotional products for clients has some additional levers, because they place repeat orders and carry the relationship with the end customer. This final section covers how a trade program changes the picture, with only the facts that matter.

What a trade program changes

A trade program replaces one off negotiation with published terms. The Inkgility Trade Print program has four tiers: Creator, Reseller, Pro and Enterprise, at 10, 20, 30 and 35 percent off retail. The program covers print, signage, stickers, promo products and apparel on one statement, so a reseller who buys several kinds of work does not manage several accounts. Applications are reviewed within two business days, and you can apply here.

Two other facts matter for reselling. Blind shipping is a checkout option for approved trade customers on every tier. It is never the default, so ask for it on each order that needs it. The blind shipping guide explains how it works. And a resale certificate is required from the Reseller tier up, which is covered in the piece on resale certificates and sales tax.

How to use published terms in quoting

Published tier discounts make the ledger more predictable. You know your cost basis before you quote, which lets you give clients firm numbers faster. It also removes the need to renegotiate for every job, so your time goes into the parts of the order that actually vary: the artwork, the quantity and the timing. For help choosing a supplier, see the guides on how to choose a trade printer and on trade printers, brokers and resellers.

What to ask any supplier, trade program or not

Whichever supplier you use, ask the same questions. How long is the reorder window, and does it restart on each order? Which fees are itemized? Is there a less than minimum policy? How is the underbase counted? What is the policy on samples? Put the answers in a short note per supplier. A distributor who can say these in a sentence each has, in effect, memorized the supplier's price structure, and quotes faster and more accurately for it.

SuppliertermsMinimumsSetup rulesReorder windowFee listSample policyLead timeMinimumsSetup rulesReorder windowFee listSample policyLead timeSupplierterms
Six facts to record for every supplier before you quote their products.

Frequently asked questions

Why do promotional product suppliers have minimum order quantities?

Because each job carries fixed work that costs about the same whether it covers fifty pieces or five thousand: checking artwork, making screens or plates, loading the press and packing the order. A minimum keeps small jobs from losing money, and it is usually set near the point where that fixed work stops dominating the cost. Some minimums come from the factory rather than the distributor, especially on custom shaped or custom woven goods. Ask which kind you are facing, because factory minimums rarely move and policy minimums often do.

What is the difference between a setup fee and a run charge?

A setup fee is a one time cost to prepare the job, such as screens, plates or a stitch file. A run charge is the cost per piece to decorate, and it generally falls as quantity rises. The setup stays the same at fifty pieces and at five hundred, which is why the per piece total drops when quantity grows. When you compare quotes, add the setup and the run charge at your actual quantity, then divide, instead of comparing the per piece number alone.

Are setup fees ever waived?

Yes, in several common situations: repeat orders using the same artwork, larger quantities, orders that bundle several products with the same logo, and promotional periods. Many suppliers keep screens, plates and stitch files for a reorder window, often a year or more, and skip the setup if nothing about the artwork has changed. Ask about the policy before you order, note the expiry date, and be specific when you request a waiver, because a specific request is easier to approve.

Can I order below the stated minimum?

Often, at a premium. Many suppliers accept a smaller quantity with a flat less than minimum charge, and that charge is frequently lower than the cost of buying extra pieces to reach the minimum. If the minimum comes from a factory, it will not move, but a stock item with an imprint may have a much lower one. You can also switch to a method with little setup, such as laser or digital printing. Ask before assuming it is impossible.

What is a price break?

A price break is a quantity threshold where the per piece price drops. Common breaks sit at fifty, one hundred, two hundred fifty, five hundred and one thousand pieces. The first break is the minimum. Because each break spreads the supplier's fixed costs across more pieces, the drop is steepest at the start and flattens later. If your quantity sits just below a break, ask for the next break as well. A slightly larger order can have a lower total than the smaller one.

Why does a quote show a different price than the one I saw online?

Online or catalog prices usually show a base price for the blank or for a standard imprint, at a specific quantity. A real quote adds your decoration method, number of colors, locations, setup, art work, packing and shipping. It may also apply a different price break than the one you assumed. Ask for a line by line quote and compare it with the catalog price at the same quantity, so you can see which charge is responsible for the gap.

How do I explain a setup fee to a client who thinks it is a rip off?

Use the tool idea. The setup is what it costs to make the tool for their logo, such as a screen, a plate or a stitch file, and the per piece price is what it costs to use it. Show the setup on its own line instead of burying it, and show what happens to the per piece cost at a higher quantity. Clients usually accept a fee they can see and understand, and they often decide to order a little more once they see the effect.

Does a second imprint location cost double?

Not exactly double, but it carries its own setup and its own run charge on most tooled methods. A back print on a shirt needs a separate screen set and a separate pass. Some products are decorated on multi position equipment, which can make extra locations cheaper, but do not assume it. Ask for every location itemized on the quote, check that the product has room for it, and let the client decide whether the extra location is worth the money.

Should I always buy at the next price break?

No. Compare the extra cost of the added pieces with what you will really use. If the client will use the extra pieces within a reasonable time, the next break is often the better buy, because setup is paid once and the per piece price is lower. If the pieces will sit unused, or the logo might change soon, they are waste. Work out the total at both quantities, divide the difference by the added pieces, and decide with that number in hand.

What fees besides setup should I look for on a quote?

Look for art or proof charges, color change charges when a product comes in several blank colors, extra location charges, less than minimum fees, packing and bagging charges, freight and handling, rush fees and sample fees. Not every quote includes all of them, but any of them can appear on the invoice if it was not itemized. Send the supplier a short list and ask them to confirm which are included, so the number you give your client is the number they pay.

Quote decorated products with a supplier built for resellers

Published tier discounts, blind shipping as a checkout option, and applications reviewed within two business days. See what the Trade Print program includes.

Explore the Trade Print program